Revaluing city-owned property is expected to produce a book gain of CHF 2.5 billion. The city executive proposes an “extraordinary housing package”; the 2027 budget swings from a CHF 407 million deficit to a CHF 1.34 billion surplus.
To enlarge the lakeside park, the Stadtrat wants to rezone or buy the lakeside part of the KIBAG site next to the Rote Fabrik. It rules out homes on the lakefront; on the street side it will look again at a limited share of affordable housing.
The Jugendwohnhilfe foundation receives interest-free loans from the city's youth housing fund for two of its buildings. Rents for 163 places fall by around 11 per cent.
The Kraftwerk1 cooperative will build around 400 non-profit homes for all stages of life on the city-owned Grünwald site in Zurich-Höngg, together with two other non-profit developers. Construction starts in 2034 at the earliest.
The city executive has bought a plot with twelve apartment buildings. The flats count towards the goal of making a third of all rental flats non-profit by 2050.
The city-owned houses at Torgasse 9 and 11 near Bellevue will be renovated from June 2027. The restaurant space goes, and the flats get kitchens, bathrooms and new heating.
The city statistics office’s 2026 rent survey shows a slower rise than in 2022–2024, but large gaps: non-profit or not, new build or long-running lease, old town or Affoltern.
The city approved all five municipal proposals, and in the high-rise dispute it backed the city parliament’s version. Kreis 12 rejected two of them. On the cantonal teachers’ law, the city voted differently from the canton.
The city executive expects deficits of around CHF 600 million a year until 2030 and is therefore cutting or postponing investments, from the Tiefenbrunnen marina to the Dammsteg bike bridge.